Skip to Content
SAP Supply Chain Management

How to force 100% Resource Utilization in SAP APO Supply Network Planning Optimization-Based Planning

The paper describes how to reach 100 % resource utilization in SAP APO Supply Network Planning Optimization-Based Planning with resource capacity variants. When you penalize falling below the minimum resource utilization and the minimum resource capacity is 100 % the SNP Optimizer will always try to plan for 100 % resource utilization even if the demands are not sufficient for full utilization.

View this Document

No comments