MAN Production Planning (PP)

Demand Management: FAQ and consulting notes

Tags:

A PIR is not consumed by a sales order, stock transfers are reducing PIRs, withdrawal quantities are missing after a transference from APO...

The most common issues on demand management are related to consumption and reduction of planned independent requirements and the withdrawal quanties.

The anwers to the most asked questions on these topics can be found on the following FAQ and consulting notes:

1819952Stock transfer: Control the reduction of Planned Independent Requirements
1715491Planned independent requirements consumption/reduction by sales order and deliv
883434MD62: Duplicate planned ind reqmts for one pd (consulting)
772856FAQ: Consumption of planned independent requirements
772857FAQ: Independent requirements reduction/withdrawal quantity
772859FAQ: Characteristics planning
318050 Tip:Reductn of plnd ind.reqmts for sevrl strategies
339043Demand management and change of calendar
166267 TIP: Changed material master data in demand management
135807Reorganization of planned independent requirements
71158No reqs.reduction during stock transf. within plant
47045Tip check list f. indep.reqs.reduc./consmptn probs