Skip to Content

Replacing an EAI Platform with SAP PI (Process Integration): Report from a Real Project

This article is about a real EAI project in 2007/2008. The project order was to replace an existing EAI platform by SAP PI 7.0. The article reflects some observations as well as some continuative thoughts and conclusions.

View this Document

Tags:
Former Member

No comments