MRP-based Detailed Scheduling and Subcontracting

I demonstrated that the combination of Subcontracting Without Source Location in PP/DS with subcontracting components (materials provided to the subcontractor) with MRP-based Detailed Scheduling does not need the following master data in the SAP APO system: •Transportation lane for the ordered product •Production process model (PPM) or the Production Data Structure (PDS) in the destination location MRP-based Detailed Scheduling allows you to derive the benefits of detailed scheduling in SAP APO and continuing to use your existing subcontracting process in SAP ERP without requiring additional master data in SAP APO.