Skip to Content

SAP GRC Process Control 2.5_Integration with BI System

The steps in this document describe how to create a link in NWBC process control reporting work center for PC BI report. Once the link is created it helps to connect PC 2.5 system with BI system and pull up the Global Heat Map report data from BI system.

View this Document

Tags:
Former Member

No comments