Skip to Content

How to Move Integration Scenarios (ESR ID Objects) from PI 7.0 to PI 7.1

SAP NetWeaver Process Integration 7.1 has introduced many feature and performance enhancements which provide PI developers with greater flexibility, options and increased design/configuration speed, in addition to increased runtime performance. This document provides the reader with a comprehensive overview of the steps required to upgrade the Integration Repository and Integration Directory objects from XI 3.0 or PI 7.0 to PI 7.1.

View Document

Tags:
Former Member

No comments