what is teco

Former Member
0 Kudos

hi

gurus

what is teco

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

TECO -Means Technical Completed Used In Process /Production Orders.

Its is STATUS of The Order.An Order can Be deleted only

TECO Status.

Regards

Siddarth

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi Pankaj,

Technical completion means ending a production order from a logistical viewpoint. This function is usually used, if the execution of an order has to be stopped prematurely or if the order could not be executed in the required manner and open requirements for the order (reservations, capacities) should be deleted.

The following actions are executed if an order is set to Technically complete.

The order is not relevant for MRP planning

Reservations are deleted

Capacity requirements are deleted

Purchase requisitions for external operations or non-stock materials are deleted

The order and its operations receive the system status Technically Completed (TECO)

If an order is technically complete, you cannot change it. The fields in the order are displayed but cannot be changed. You can however cancel technical completion, for instance if order data has to be changed.

Regards,

R.Brahmankar

former_member184655
Active Contributor
0 Kudos

Dear Pankaj,

1.TECO stands for Technically Completed Status of a production order.

2.It's given to those production orders which are to be stopped prematurely due to some reason,say

mistakenly you have created a production order for X instead of Y.So you have to delete the open

reservations,capacities meant for that order.

3.One more thing before closing a production order,that particualr production order must be having either

TECO status or Released.

4.To perform this function goto change mode of production order CO02 ,top menu Functions---> Restrict

processing -


> Technically complete.

5.After technical completion you can still make postings for the order. For instance, material withdrawal or

a confirmation can be posted if they were previously forgotten.Eg Say we have set the TECO status for a

production order,but still Using T code CO11N we can do confirmation.

6.[Link for SAP help regarding TECO|http://help.sap.com/saphelp_erp60_sp/helpdata/en/a5/63198843a211d189410000e829fbbd/frameset.htm]

Regards

Mangalraj.S

former_member335796
Active Contributor
0 Kudos

Hi,

TECO - Means Technical Completion of the Production/Process order.

Technical completion means ending a production order from a logistical viewpoint. This function is usually used, if the execution of an order has to be stopped prematurely or if the order could not be executed in the required manner and open requirements for the order (reservations, capacities) should be deleted.

The following actions are executed if an order is set to Technically complete.

The order is not relevant for MRP planning

Reservations are deleted

Capacity requirements are deleted

Purchase requisitions for external operations or non-stock materials are deleted

The order and its operations receive the system status Technically Completed (TECO)

Regards,

Siva

former_member186413
Participant
0 Kudos

What is the status code for TECO ,, like i0009 , i00045 etc.?

Former Member
0 Kudos

Hai,

I0045

You can review this mapping in table TJ02T.

Best Regards,

DB49

former_member186413
Participant
0 Kudos

Well, thanks....