Error:conversion of PPDS order from SNP order-error /sapapo/rrp_heur45

Former Member
0 Kudos

Hi,

I am converting a snp planned order from ppds order in transaction /sapapo/rrp_sap2ppds and using heuristic sap_pp_002.But it is canceling the heuristic and giving above error message.I have given 60days ppds horizon and 61days snp horizon.lot size:lot-for-lot.Please suggest what to do?

Thanks&regards

venkadesh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello ,

The hueristics sap_pp_002 you are using is based on algorithm "planning of std. lots".

For converting Supply Network Planning (SNP) orders or Capable-to-Match(CTM) orders into Production Planning and Detailed Scheduling (PP/DS) orders, try to use a heuristic based on the algorithm /SAPAPO/HEU_SNP_CONVERT, such as the standard heuristic SAP_SNP_SNGL..

I think the above mentioned hueristics should be able to solve the problem .

Also for more information refer to below link.

http://help.sap.com/saphelp_scm2007/helpdata/en/8a/475c3c3906b106e10000000a11402f/frameset.htm

Thanks & Regards

Abhijit S Nakhwa

Former Member
0 Kudos

Abijit,

Error is coming when i am trying to convert the order with SAP_SNP_SNGL heuristics only.This is the standard functionality too.Anybody can suggest how to use with SAP_SNP_Mult and is there any program for converting SNP Planned order to PPDS order(not CTM).

Thanks&Regards

venkadesh

Answers (1)

Answers (1)

Former Member
0 Kudos

This issue is resolved by myself when i am using with background transaction.