Hi Friends,
Kindly clarify me ,is it possible to configure that the several good receipt to single inspection lot ?( (ie) i receive same material number of times but i need to assign single inspection lot .if yes how to configure in the system
Regards,
Renuga.A
Hi Joshi
Please clarify how to create one inspection lot for multiple GR using DMR
if my PO contains 1000pc, i received 10 times
if MM -QM view either I select one inspection lot for 1 po or each GR
in both case my first lot UD finished and then I am receiving 2nd gr(100pc) -- system will not create lot or new inspection lot but you can't assign to the same lot. --- plz correct me if I am wrong
In DMR --- based on previous history system will decide current quality level
If my DMR stage is skip stage or normal -- system will create new inspection lot or it will not creae
if result recorded and after ud or auto ud(pre set time lapsed) any new gr ,I can't assign to same Inspection LOT,
plz correct me if I am wrong
Thanks
Sami
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In the Qm view of material master, go to Control of Inspection lot. There u have to select " For each Purchase Order and Batch. This will create a single inspection lot for a PO and not for each material document.
regards
Ashwin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Renu,
To meet you requirement is 100% possible in SAP. You will be in need to implementing DMR (dynamic Modification Rule)
To implement it refer the document below.
[Displaying the Use of Dynamic Modification Rules|http://help.sap.com/erp2005_ehp_03/helpdata/EN/2d/352435448c11d189420000e829fbbd/frameset.htm]
[Creating a Dynamic Modification Rule|http://help.sap.com/erp2005_ehp_03/helpdata/EN/3c/929d17db7d11d283cb0000e829fdb3/frameset.htm]
[Replacing Dynamic Modification Rules|http://help.sap.com/erp2005_ehp_03/helpdata/EN/2d/352490448c11d189420000e829fbbd/frameset.htm]
[Dynamic Modification - The Concept|http://help.sap.com/erp2005_ehp_03/helpdata/EN/fc/96c3d0adda11d1890c0000e8323492/frameset.htm]
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Whenever you do GR , automatically Inspection lot is created, so check for any user exit/BAdi to fulfill your requirement.
regards
Rm
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,,
you cannot do this in SAP. For every lot inspection lot is
created.why do you want these kind of requirement
G.Ganesh Kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.