on 08-07-2008 12:12 PM
Hi
If there is a parallel XI landscape with one XI 3.0 system(DEV,QA and PRD) and other PI 7.0 system (DEV,QA and PRD) , both running in the same landscape , and there is requirement of transferring/ copying some software components (some interfaces) from the XI to PI system.
Both XI 3.0 and PI 7.0 are having their own separate SLD each.
Can anyone please tell what would be the series of steps that need to be performed on the SLD and XI/PI systems for copying the SWCV.
thanks
Nilesh.