on 08-05-2008 7:33 AM
Hi Experts,
We are facing a peculiar problem. I have set up material replication from ECC 6.0 to SRM 5.0. All required table entries have been manitained in ECC and SRM. The required sites have been created in SRM.
When I load DNL_CUST_BASIS3, the ojbects are halted in the outbound queue of the ECC system.
SYSFAIL : Time limit exceeded.
Have you ever faced a similar issue. Please do let us know as we have no clue why this is happening.
Thanks and best regards,
Jith
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Please strictly follow the note in 720819
Please check all the below ..
SMOEAC -RFC destination and logical system maintained correct or not
RFC user profiles - Check .Believe that the user might have profile
SAP_ALL and SAP_NEW .
Definetly you will have some clues from the below
SMQ1
SMQ2
r3am1
SMW01
SLG1
SMWP
plz check via sm59 , whether could you connect r/3 vice versa.
regards
Muthu
Edited by: muthuraman on Aug 5, 2008 8:47 AM
Hi Experts,
Thanks for your inputs.
I have been able to replicate DNL_CUST_PROD0 and DNL_CUST_PROD1. Subsequently material has also been replicated.
However, DNL_CUST_BASIS3 fails. I have been looking at note 872533 - FAQ Middle ware which says,
Question 2. What has changed in the middleware since SRM 4.0
Middleware is now detached from CRM.
Elimination of CRM MW objects (for example, DNL_PLANT, DNL_CUST_BASIS*)
Does it mean that we no longer have to maintain, DNL_CUST_BASIS3.
Awaiting your response.
Thanks and best regards,
Jith
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.