hi all,

how can i use the condition type EK01 or EK02 in variant configuration. (i want to see calculated cost for config. materials in sales order)

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

hi,

hi ,

Ek01 : this is condition type used to get the actual cost from the material master and post in the sales order.

Ek02: this condition type used to get the calculated cost based on the master master which are selected at the time of the sales order.

example if i have material cpu = cost 10,000 in material master. Monitor = 5 000 , keyboard = 300.

if the monitor 15 inches : 5000 , 17 inches = 7000.

so the if we select variants CPU + Monitor 15 " + keyboard 15,300.

If we select variants CPU + Monitor 17 " + keyboard = 17,300. - Calculated cost.

so at to profit is calcualted based on EK02.

thanks