cancel
Showing results for 
Search instead for 
Did you mean: 

Plan with Usage 5 and Status 3 not getting assigned to lot of type 01

Former Member
0 Kudos

Hi Everybody,

For a particular material the Inspection Plan header has Usage 5 and Status 3. When a inspection lot is created with inspection type 01, this plan is not getting assigned to the lot. When I change the Status of the plan from 3 to 4, the plan gets assigned to the lot easily.

Can you please tell me why this is happening ?

Regards,

Manish.

Accepted Solutions (1)

Accepted Solutions (1)

0 Kudos

Hello Manish,

inspection plans are not designed for costing purposes accordingly the status 3 avoids the assignment of the plan.

As you have already noticed, you need to generally release the plan to use it in QM.

Regards,

Isabelle

Answers (1)

Answers (1)

Former Member
0 Kudos

HI

if you set usage 3 (costing),in the inspection plan,when lot is craeting system will not recognize,

if you set 4 release for genearl then only system will recognize nad it will assign to LOT.

-ashok