cancel
Showing results for 
Search instead for 
Did you mean: 

Error during PI 7.0 installation

Former Member
0 Kudos

Hi,

We are in the process of installation of SAP Netweaver PI 7.0 in IBM i5 OS with DB2 database.

The ABAP stack installation went well, but in Java stack the deployment of com.sap.xi.directory is taking very long time. It is running for almost 15 Hours. the worst part is it is not displaying any error and the log files are not updating.

Can anybody give us some clue on this?

Kind Regards,

Indrakumar

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

We have solved the issue as per the SAP Note No. 993189.

The problem is Max Thread Count value. For i5 (AS/400) OS the value needs to be set to 350. After changing the threrad value from 40 to 350, the installation finished successfully.

Kind Regards,

Indrakumar

Former Member
0 Kudos

HI,

check

1. In the technical settings tab enter the details SAP SID/URL and system number#.

2. Enter the Gateway host as same details above SID/URL.

3.Gateway service is 3300+system number#.

4.In the Logon /Security tab, enter the client user & Password details of Destination system.

Otherwise, check after ur ABAP instalation did u made restart.

if it is restart and install java stack

thanks,

Sendil