on 07-29-2008 3:33 PM
in configuration IDOC will you do some settings ?what are they?
Thanks
For transfer of IDoc between R3 and XI following ALE setting needs to be done..
ALE settings for IDOC
SAP XI
1) RFC Destination (SM59)
2) Create Port (IDX1)
3) Load Meta Data for IDOC (IDX2)
SAP R/3
1) RFC Destination (SM59)
2) Create Port (We21)
3) Create Partner Profile (WE20)
Also have a look at this Blog
Thanks
SaNv...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Follow these steps
SAP XI
1) RFC Destination (SM59)
a) Choose create.
b) Specify the name of the RFC destination
c) Select connection type as 3 and save
d) In the technical settings tab enter the details SAP SID/URL and system number#.
e) Enter the Gateway host as same details above SID/URL.
f) Gateway service is 3300+system number#.
g) In the Logon /Security tab, enter the client user & Password details of Destination system.
h) Test the connection and remote logon.
2) Create Port (IDX1)
a) Select create new button
b) Enter the port name as SAP+SID (The starting char should be SAP)
c) Enter the destination client.
d) Enter the RFC Destination created in SAP R/3 towards other system.
e) Save
3) Load Meta Data for IDOC (IDX2)
a) Create new
b) IDOC Message Type
c) Enter port created in IDX1.
SAP R/3
1) RFC Destination (SM59)
a) Choose create.
b) Specify the name of the RFC destination
c) Select connection type as 3 and save
d) In the technical settings tab enter the details SAP SID/URL and system number#.
e) Enter the Gateway host as same details above SID/URL.
f) Gateway service is 3300+system number#.
g) In the Logon /Security tab, enter the client user & Password details of Destination system.
h) Test the connection and remote logon.
2) Create Port (We21)
a) First Select Transactional RFC and then click create button
b) Enter the destination port name as SAP+SID (The starting char should be SAP)
c) Enter the destination client.
d) Enter the RFC Destination created in SAP R/3 towards other system.
e) Save
3) Create Partner Profile (WE20)
a) Create New
b) Create the Partner no. name as same the logical system name of the destination system.
c) Select Partner type LS
d) Enter details for Type: US/USER, Agent, and Lang.
e) Click on the + button to select the message type.
f) Select Partner no. and LS which ever create above.
g) Select Message type
h) Select Process code related to the Message type.
I) save.
In SLD System Landscape Directory
TS for R/3 (Logical system):-Assign the client name created in R/3 as Logical system Name.
Ts for Third Party (Logical system):-
BS for SAP R/3 (Logical system):- Assign the client name created in R/3 as Logical system Name.
BS for Third Party (Logical system):-Enter the XI logical system name.
In Transaction SALE
Define and Assign the logical system name.
after these settings
go to the Business System .
In the menu
go to servive then adapter specific identifiers and check wether the settings are right
Hope this is helpful
Thanks
Saiyog
Edited by: Saiyog Gonsalves on Jul 29, 2008 5:52 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
in configuration IDOC will you do some settings ?what are they?
1) We have to check the RFC Destination on both sides (R/3 And XI) using SM59.
2) We have to check whether the port is created or not using we20.
3) We have to check partner profile using we21.
4) On Xi side we have to check the port connection using IDX1.
5) On xi side we have to check whether IDOC Metadata is loaded or not using IDX2.
Regards
jayaram.g
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
10 | |
10 | |
9 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.