cancel
Showing results for 
Search instead for 
Did you mean: 

user exit/BAPI for UD

Former Member
0 Kudos

Dear Experts,

My client want some Userexit/Bapi to make automatic UD while doing GR .

i.e. no UD done seperatly, but this required in some cases only, not for common for all GRs

Could any one know any userexit/Bapi related this please.

regards

Ramu

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Ramu,

Why you want to go for an User exit or BAPI.

Instead try to solve it in a functional way, my suggetion would be you can schedule a job with very less frequency (for example 5 mins or 2 mins) for Report RQEVAI30 (Tcode : QA17).

This shall solve your problem without any extra developments and in a standard manner too.

Regards,

Arpit

Answers (5)

Answers (5)

Former Member
0 Kudos

thanks

former_member42744
Active Contributor
0 Kudos

Maybe you can explain your requirement a bit better?

Why would you bother creating the inspection lots in the first place? If you are not going to record results and you are making the UD at GR, then why bother with them to start with?

Craig

Former Member
0 Kudos

Hi Ramu,

Further to your query, you cannot use BAPI or user exit as Inspection lot will only be generated at the time of Material Document posting.

You need to Trigger a Workflow after you post material document. So, logic will be a Workflow will be triggered as soon as you post the document and this will Post Usage Decision for material. You can use BAPI BAPI_INSPLOT_SETUSAGEDECISION in Program code of workflow.

Regards,

Arpit

Former Member
0 Kudos

Dear Ramu,

You can do it the other way also. By using the collective UD.

Pleas refer the link for further details.

[;

Regards,

Shyamal

Former Member
0 Kudos

Hi Ramu,

I am not sure but u may check

QAAT0002 Control of acceptance lots/goods receipt

QEVA0001 Enhancement: Quantity posting for usage

As per ur requirements.

Ramesh