cancel
Showing results for 
Search instead for 
Did you mean: 

switch step in BPM

Former Member
0 Kudos

Hi Gurus:

Somebody help me with some information about how to Configurate the switch step (Condition, left operand) in BPM

Thanks & Regards

Silvia

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos
Former Member
0 Kudos

Thanks a lot!!

Former Member
0 Kudos

Hi,

Check this link:

[http://help.sap.com/saphelp_nw70/helpdata/en/67/49767669963545a071a190b77a9a23/frameset.htm]

You can have constant or container variable in left operand.

Check the integration process MultipleFlightBookingCoordination in namespace: http://sap.com/xi/XI/Demo/Agency of SAP BASIS component for example.

Thanks,

Beena.

Former Member
0 Kudos

Hi,

please have a look at this thread:

Regards

Patrick