Planning calendar for Heuristics

Hi,

If my location heuristic run needs to follow a particular calendar to generate orders, where do I specify that?

FYI:

The product is externally procured and the vendor and location have a External procurement relationship defined.

The orders need to be generated as per a calendar with only mondays.

I don't want to assign that in shipping or receiving calendars in location master as the vendor has to send other products to other locations on other days as well and the same case with receiving location that it gets different products from the vendors on other days of the week. I have a different calendar for that.

Former Member
Former Member replied

Dont think you can define calendars at product location level. You can do two possible things:

1. Split the location into multiple that have unique sets of products with same calendars. So essentially define mutiple proxies of locations based on number of differen calendars

2. Run a follow-up macro post-heuristics that rearranges the orders based on different calendars. You would however have to keep the location specific calendar as all working days.