on 07-19-2008 10:36 AM
Hi everybody
My client wants to skip the lot or to have reduced inspection based on the vendor Batch that we give at the time of GR.
Is it possible to have this?
Regards
Mohanraj.C
Hi,
It is not possible with standard DMR , you need to find some user exit for MIGO to avoid the inspection lot generation on the basis of vendor batch number.
Sanjay
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi mohan,
You can use the dynamic modfication rule to control the skip lot (i.e after 2 inspection lot 1 lot has to be skiped like that). you can use the dyanmic modification rule in the header of the inspection plan.
If you can explain clearly on you process,we can able to give the suggestion.
regards,
jai
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi jai
Thank you for your reply
My question is
We have batch management in our project
My client procures raw material in accordance with the specfic Heat no.(for eg. say HF1234).User who inward the material in MIGO, enter the Heat No. in the vendor batch field in the Batch Tab at the time of MIGO.
For my client if the Heat No. which is inwarded now is the Heat No. that has been already inspected and accepted, then at this instance the inspection lot should not be generated.
Regards
Mohanraj.C
The vendor's batch number should be enterred as the internal batch number. You can then use the "control inspection lot" field in the 01 inspection type settings to prevent a second inspection if the batch has already been rec'd. You cannot use the actual vendor batch number field for this.
Craig
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.