Routings assigned to WBS element explosion in PS

Former Member
0 Kudos

Hi all,

How can we explode the routings created in CA01 ( assigned to WBS element ) in PS?

What is the integration point of PS and QM?

Early reply requested.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

There is no functionality availble for exploding the rountings in PS. The integration between PS and QM is thru material only.

Regards

Murali

Former Member
0 Kudos

Hi,

Pls explain how can we link a material to QM via PS. I understand a material procured with stock type Q can be inspected in PS.

Pls help me

Former Member
0 Kudos

hi sravan,

you can do complete QM settings in material master MM02 itself so that once this material is bought through PO and before GR to store inspection lot gets created and you can carry out testing process , you need to define sampling procedure and additional date , plz refer QM for this .

You cannot trigger inspection lot from PS .