HI,
what r the prerequisites for implementation scm-apo in ECC 6.
Thanks,
Ashutosh
9891595497
Hi Ashutosh,
you can find all informations about the implementation (installation /upgrade) of SCM on the SAP help portal.
In http://help.sap.com choose in "SAP Business Suite" the "SAP Supply Chain Management".
In Knowledge Center for SAP Supply Chain Management (SAP SCM) choose the required SCM release e.g. SAP SCM 5.0 and open it.
Here under "Installation, Upgrade, Master and Operation Guides" you can find all necessary information about the installation, technical upgrade and operation of SAP SCM.
The Master Guide for SAP SCM provides important information about the installation of the relevant scenarios and the components. It links to all other documents that are required for the implementation of a specific scenario, for example to the Upgrade Master Guide, which is the important overview guide for upgrading scenarios .
I hope I could help you with these informations.
Regards,
Tibor
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
These are the basics to my knowledge
1. Material Master for all materials that need to be planned should be setup
2. Plants, vendors(in case of VMI), workcenter, routings, scheduling agreements are to be setup
3. You need to have of course MM and PP installed.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
4 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.