Quality Management - Insp lot with status CRTD CHDR SPRQ

Former Member
0 Kudos

I am not able to do usage decision for Insp lot with status CRTD CHDR SPRQ but I can do usage decision for status REL CALC SPRQ.

Can anybody know why ?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

pl check the lot is assigned for inspectioon plan ore not.

got QA02 check in inspecion specification TAB.

If there is noe inspection plan (group)

you need to create a inspection plan, and then come to QA02

then you need clickon TAsk list/spec button in insp.specification tab.

Pl check and try

-ashok