What is requirment class how should we answer for this question? please give me some examples on this
what is requirement type what is the difference between these two?
Thanks & Regards
points will be rewarded
hi,
Req class
The requirement class controls the MRP and the requirements consumption strategy as well as the relevancy for planning. Specifications on the settlement of the requirement class, for example, the settlement profile and the results analysis key, are preferably used by Materials Management and do not have to be used when configuring the availability check and transfer of requirements.
The requirement class specifies the following points:
1.Whether an availability check and a transfer of requirements is carried out for a transaction (for sales documents, fine tuning using the schedule line category is possible),
2.Whether the requirements are relevant for MRP,
3.The allocation indicator from the sales view which controls the settlement of customer requirements with planned
independent requirements
4.Whether an item is to be settled to an auxiliary account assignment,
5.The settlement profile,
req type
Together with the item category and the MRP type of the material, an allocation to the individual transactions in sales and distribution is carried out by means of the requirements type. requirements type . Every requirements type is allocated to a requirements class with its corresponding control features.
While a requirements type is allocated to a single requirements class, a requirements class can be allocated to several requirements types. As a result, it is possible to control different transactions in a uniform manner with regard to their technical procedure.
hope this helps u
regards,
Arun prasad
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Requirements type
The various requirements are identified by their requirements type. The requirements type refers to the requirements class and its control features.
Requirements Class
The requirements class contains all control features for planning such as relevance for planning, requirements planning strategy and requirements consumption strategy. In addition, it is specified at a global level whether an availability check is to take place for the material in the sales and distribution documents on the basis of the ATP quantity (ATP = available to promise) and whether requirements are to be passed on. A finer degree of control can be obtained for sales documents using the schedule line category
Prerequisites for controling availability check ang TOR
The availability check must be switched on at requirements class level and - for the availability check in the sales documents - at schedule line category level
A requirements type must exist by which the requirements class can be found
Regards
Murthy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.