Hello everyone,

I followed the configuration guide PDP-SI, but the idoc is not created when I created a PO in MM.

When I check the message "NEU" in the PO, it is in yellow.

Do you know if it is needed something else??

I'm working with SRM 5.5 and ECC 6.0.

Thanks,

Ivá

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

It was a configutarion issue, but it was in the release strategies in MM.

Thanks,

Ivá

Former Member
0 Kudos

Hi,

You need to define a message type and have a control data in the message determibation schema and the Vendor wise condition record for this message type so that the PO picks up the right message type for processing the output.But this message type shall also have a processing control in the partner Profiles in addition to being defined with the EDI & RM NASTED in the message routine for the message types.

Useful Tx Mn04,We 20

Path Materials Mangement>OutputControl>Messages>Definition of Message type & Message determination schema

Thanks & Regards,

Nagarajan

Former Member
0 Kudos

HI Ivan,

Have you done an entry of the vendor code in the distribution model (BD64) for message type Z_CREMAS_SUSMM?

Regards,