on 07-12-2008 3:28 PM
Hi Expert!!
I am little bit confused about the system copy.
Actually, i am working for the Refresh QAS which is Central System (stand alone system) however PRD is running on high availability environemnt. I want to perform the system copy of the PRD server.
which option should selected from the Source system to perform the system copy ?
1) Central System
2) High Availability System
I read lot of material and become confuse...
Please advise us. !!!!
Regards
Anwer Waseem
SAP Netweaver
Hi Waseem
First check the type of installtion you have ,Then go to Additional Life Cyle Tasks --> and chose accordingly for e.g if you are using distributed installtion Go to SystemCopy >Oracle > distributed system --> Based on ABAP system -->Database Instance Export.
You can change the option according to your setup,Database Instance export need to be run on where your database resides.
Hardeep Bajwa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Hardeep!
Thanks for the reply;
Actually, This is high avialability enviroenment with double stack with the MS-SQL database.
I am preparing the Export database for the Quality server which is central system. not distributed / HA system.
therefore, I have raised the issues on the forum that should i select the Central System or High Availability option for the export preparing from the High Availability System.
1)
SystemCopy>MS SQL Server>Source System>Central System>Based on AS ABAP and AS JAVA then datbase and central instance export
2)
SystemCopy>MS SQL Server>Source System>HIGH AVAILABILITY System>Based on AS ABAP and AS JAVA then
datbase instance export
central instance export
REgards
Anwer Waseem
SAP BASIS
User | Count |
---|---|
80 | |
24 | |
11 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.