cancel
Showing results for 
Search instead for 
Did you mean: 

DMR,

Former Member
0 Kudos

Hi friends

Kindly requesting all to explain me about the DMR dynamic modification rule, and where is it s application

can i run a test cycle

Thanks

Deepak Goura

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi ,

Basically DMR we used for determine the sample size for an inspection in the SAP system in different ways on the basis of the past inspection valuations to calculate the current inspection scope.

On the basis of this you can skip the inspection if you are continuosly getting a good quality product from your vendor & may tighten if the goods quality is low.For using DMR you have to create first the DMR rule thru T code QDR1 & have to assign different inspection stages,here you define how inspection scope change with past inspection results.

DMR you can assign directly in material master quality view , in quality plan, per characteristic as required by you.

For more details go the link below:

http://help.sap.com/saphelp_erp60_sp/helpdata/en/26/b9ba34e465b73ee10000009b38f83b/frameset.htm

Cheers,

Tushar