Problem: trying to copy data from Infocube to Planning area (TSCUBE)

Former Member
0 Kudos

Hi!

I´m trying to copy data from Infocube to Planiing Area, but all CVC are shown in the log like this:

35768 combinationens of InfoCube are not contained in the BasisPlobStru

FACTURA 0000626452 234230 SPIC 11 S01

FACTURA 0000626452 234361 SPIC 11 S01

FACTURA 0000625807 234230 SPBA 11 S23

FACTURA 0000626327 234230 SPBA 11 S27

FACTURA 0000625970 234230 SPNS 11 S47

FACTURA 0000626327 234492 SPBA 11 S27

FACTURA 0000625878 235202 SPNS 66 S36

The 9AVERSION of Infocube (Version: FACTURA) is different from Planning Area (Active version: 000). I can do that, can´t I?

Thanks in advance,

Daniel Paiva.

Accepted Solutions (0)

Answers (3)

Answers (3)

0 Kudos

I'm having the same issue, however, I know that all the CVC's required to load the data from my cube exist. Some data, very little, is transferring over into the planning area / book. I can't see that there is any significant difference between the records that load and those that don't.

I reviewed the existing CVC's, there are none with null entries.

Is there anything else I should be looking for?

Former Member
0 Kudos

you sure can

in your TSCUBE variant just set the source version to FACTURA and target to 000 or whatever version you have activated your time series for

the MPOS doest contain the planning version used for the copy. but it creates a listing based on the initialised time series since you assign the PA to the MPOS

Former Member
0 Kudos

You can definitely have one version in infocube and load the data to another version in the APO planning area. We do it all the time. You can have a combination like the below:

Plant---Material--DivisionQty--Version

P1--


M1
D1

10
-----FACTURA

I can load the qty. as 10 for the combination P1M1D1 from this cube to APO from version FACTURA to a version 000 in APO planning area.

Version has nothing to do with CVCs.

What I suggest you to do is to take one CVC that you see int he TSCUBE log like 0000626452 234230 SPIC 11 S01 and go to your cube and see if there is a record and value for this combination. You should see one.

Go to your display CVCs in MC62 and check if you have a CVC with this combination.

The meaning of the message you got in TSCUBE is that there is no CVC with that combination but the cube has that combination.

One of the reasons why a CVC is not picked up from a cube is:

1. YOu should not have any null values for the characteristics.

I mean in the above example, if you have no division assigned as below

Plant---Material--DivisionQty--Version

P1--


M1
____

10
-----FACTURA

the system doesnot pickup the CVC and you get this message when you load that qty. to APO.

When you compare the record in cube and MC62, you will find more reasons.