on 07-01-2008 9:57 AM
hi all,
could any explain in brief QM in production process for the below scenario,
one production order created in a day but inspection of in process martial every hour and production confirmation every shift,
plz suggest the setting to be done for above scenario and where the default splits for operations to be maintained,
thanks in advance,
mohan.m ;
Hi Mohan,
Your requirement can easily be comply using inspection points 150 in you task list header.
There is very interesting and learnedly conversation is going on in this PLM forum only. Pls keep it in you watch and refer it will surely help you.
Regards,
Shyamal
Edited by: Shyamal Joshi on Jul 3, 2008 10:07 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
closed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Got to QCC0 > Define Identifier for Inspection Points
There u need to enter a function module QAPP_CUST_IP_CREATE for generation of automatic inspection points. This will generate 8 inspection points for a 8 hour shift.
Also at operation level u should activate time nased inspection and interval as 1 hour.
Regard
Ashwin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi guys,
thanks a lot for useful tips,
one more issue -- how generate the inspection points automatically in this scenario,
mohan m
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Mohan,
Maintain Inspection Type 03 in Quality Management view. And assign the Master Inspection characteristics on the operation of the routing.
When you Release the order the inspection lots will be generated.
Please maintain the Quality management Inspection point on the operation details and select time related. For Inspection point completion select Quantity, Valuation and Confirmation(Production).
mention the time as 1 and unit a HR (Hour).
You can record the results for every hour.
Thanks and regards
Murugesan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You are creating one production order & sample analusis every hour
for this tyou have to assign inspection characteristics in routing that will be your in process inspection
but if you are not doing inprocess inspection & inspection with GR in that case you have to create insepction plan for material assign inspection type as 04 in material master
Now your second issue you are doing hourly analysis this you can enter by selecting scope not fixed & single value in master inspection characteristics
you can enter tim,e & other deatils of sample by using inspection point in inspection plan
regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.