on 07-01-2008 9:01 AM
In case of non-stock material the shipping point does not change automatically with plant change, inthe sales order. In case of other materials like finished goods, a change in plant results in automatic redetermination of shipping point based on the shipping conditionloading group delivering plant rule. This results in multiple shipping points in case of a plant change in an order consisting of finished goods and non-stock materials. The shipping point then has to be changed manually. Can you tell us how to correct this?
Hi,
I have tested in our 600 system and even for non-stock material, the changing of plant will lead a redetermination of shipping point. So I think the problem should be the configuration. Please check the customizing for shipping point determination of the
changed plant.
If there is no problem with the customizing, please search SAP note with the following key words: "shipping point" "change" "plant" "redetermine".
There are several program error correction notes for this topic. You could check which one is fit for your system release.
Regards,
Smile
Edited by: Smile Zhang on Jul 1, 2008 11:24 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I think you have to maintain loading group even in the non-stock material.
Roberto
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.