on 06-28-2008 9:54 PM
Hello
In order for the availability check to be carried out, what steps must be defined in the system.
Thanks
In order for the availability check to be carried out the following data must be defined in the system
The availability check must be switched on at the requirements class level in transaction OVZG
For the availability check in the sales document, the indicator must be set at the schedule line category level in transaction OVZ8
A requirements type must exist by which the requirements class can be found in transaction OVZH
A plant must be defined in the sales order for the line item. It can either be automatically proposed by the system from the customer, the customer material information record, or the material master record. It can also be entered manually in the document.
A checking group must be defined in the material master record in the MRP 3 screen in the Availability check field.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Manik Rao
- In Material Master MRP3 view, Availability Check should be maintained
- For schedule line category, field "Availability" should be checked in VOV6
- In OVZG, Availability Check should be switched on
thanks
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.