on 06-26-2008 3:11 PM
To activate multiple specification we had to delink MIC and class characteristic link. Because of this we are not able to move data from MIC to batch?
Any way out dears?
Regards
TOM
Yes.. in the plant settings in config, on the inspection completion tab, make sure the setting at the bottom of the page, "Batch valuation without material spec" is ticked on.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Because that setting voids the need for the material spec link. As long as the MIC identified in the plan is linked to a general charac in the MIC master data, it will transfer the data.
I.e. it reads the MIC number in the plan, and goes and grabs the internal number for the general charac. If the general charac is on the batch, the value is transferred.
Craig
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.