Hi

While implementing a scenario for SRM - PI Intergration (Plan Driven Procurement with supplier Integration) I have already imported the following Contents into the PI integration rep.

SAP BASIS 7.0

SAP SRM Server 5.5

The ERP version is ECC 6.0

Now while importing the Integration Scenario into the Integration Directory when I am assigning the Service to the application components the Product and version shown is SAP R/3 4.6C. I think this should be SAP ERP 2005. I think I am missing some content import or configuration.

Do I also have to import some SAP ERP/R3 content into the Integration repository before proceeding with the SRM configuration.

Any help is appreciated.

thanks

Nilesh Taunk.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

It is always prudent to ensure all imported content is at the correct level with any installation or upgrade!