on 06-26-2008 6:52 AM
pls tell me
how to calculate this formula in SAP
with accuracy
S1 No. Product Description rate as per P.O. + (diff.*copper factor)/100= Basic Price variation Fixed factor for incl. pv Final price revised
Mm*pair (Rs/km) (Rs/km) give By BSNL variation total price
1. 0.4mm800 pair(a) 975182037 + (103181.0182.790)/100 = 188604.55 1.164800 219686.58 1194868.95 Current price of copper wire rode as per BSNL circular dt. 01/06/2008 Rs. 355764.0 PMT Less basic Price of copper as per your Purchase order Rs. 252583.0 PMT difference Rs. 103181.0 PMT
Hello
You can't expect the forum to give the fix for your project specific requirement. If you are stuck any where or any suggestions required, forum experts always provide the information.
You should try the possibilities from your side including ABAP effort, and in case if you have no clue then SAP folks will be able to share their thoughts/inputs in this forum.
Good luck
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.