on 06-25-2008 7:13 PM
Hi everybody,
I already do all topics that we need to activate Batch management related with QM, the problem is it only works for one material , when I use another material that have the same characteristics and Batch class, the result of the QM inspection doesnu2019t appears at MSC3N. Can anybody help me?
Thanks a Lot
Ivette
This is probably due to a plant setting.
In QM config, for the plant settings, see if the value "Batch valuation without material spec." is set. I'm guessing it is probably not set.
If this is not set, then you must maintain the material spec (QS61) for each material.
You can either maintain the material spec, or set this indicator.
Craig