on 06-24-2008 3:38 PM
Hi guys
Suddenly, I start to receive error messages about the RFC failure, No changes done in Basis related.
There are RFC error any many areas;
SM21 - I Maximum number of 100 connectable SAP gateways reached\
STMS - RFC communications error with system/destination TMSADM-PRD.DOMAIN_DEV
Sm59 - we cannot verify the RFC Connection
Please advise us on base of SOS
Regards
Anwer Waseem
We recently experience a similar problem. A user was not able to release a transport in our DEV system. The gateway trace file showed lots of these messages:
max no of gateways exceeded (100)
However, there were not very many logged on clients and only a few active connections. We solved the problem by doing a hard stop and restart of the gateway. SMGW --> Goto --> Expert Functions --> Hard Shutdown
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
We've got the same problem: max no of gateways exceeded (100).
But i want t know if the parameter rdisp/max_gateways can be set from 100 to 200? Will this solve the problem or are there other parameters that are related to this problem?
I've read sapnotes 978078, 887909 and 894100 but they don't provide enough information. Neither does help.sap.com.
Can annyone be of assistance?
kind regards
Ben van der Mark
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
My problem was related with the import buffers, there are 2 request generated during the applied notes and i have released the request but did not imported into the QAS & PRD Server.
Since, i have relased the reqeust my RFC Connection are failing and we are not ably to "TEST connection" in sm59, STMS are failing and system generating the "max no of gateways exceeded (100) messages.
I came out over the problem once, i cliked on "data file must be transferred" in STMS then i am able to test the connection and no messaging appearing in my sm21.
Thanks to all of you and participating and hep me. I have assigned the points to person before close the message.
Regards
Hi everyone,
We strugglled with this issue as well. All the notes in this thread had been previously implemented. We had all the parameters set to the suggested values from note 316877. Two weeks later "max no of gateways exceeded (100)" popped up again when we were in STMS.
This time we were reffered to Note 743888 - GW: gw/so_keepalive profile parameter
and it worked!!!
Hope this helps
Jon Sells
Dear Experts,
We are facing same issue.
Could not resolve with following notes:
-743888
-tried parameters: GW/SOKEEPALIVE --> 1
GW/MAX_CONN --> 1000
RDISP/GUI_AUTO_LOGOUT --> 2400
we restarted BI PRd, still problem perists....
do we need to set these parameters in ECC also?
do we need to restart ECC also?
Please help....
HI
I was encountering different RFC problem chain.
1) max no of gateways exceeded (100)
2) RFC Communication Failure
3) Error detected when checking transport files
4) Buffer Faulty
there was lot of request released but not imported into the PRD Server, once i click on "Data files must be transferred" all reqeust has been copied from the dev to PRD.
The RFC problem chain has been over by did that one.
Thanks to all of you who shared experience with me.
Regards
Anwer Waseem
SAP BASIS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Check SAP Note 978078 - Maximum number of gateways reached
Also read,
Note 887909 - Maximum number of gateway connections exceeded
Note 894100 - Maximum number of gateway clients exceeded
Regards
Juan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
to temporarily resolve this issue you can go to smgw and
smgw -> goto -> logged clients check if it is more then 100.
sort the connections according to date/time and delete old connections.
also you have to check for remote logins
smgw -> goto -> remote gateways check if it more then 100.
sort the connections according to date/time and delete old connections.
to permanently resolve we need to add parameters specified by the above notes given by Juan.
Regards
Prashanth
Hi
Thanks for the expert reply, i did same as below described, there are 6 clients in the "logged clients" by the smgw.
0 DBSERVER1 sapgw02 Local Web AS DBSERVER1 ip dbserver1 Wed Jun 25 09:02:42 2008 Connection OK
1,037 DEV sapdp01 Remote Gateway DEV ip dev Wed Jun 25 08:38:04 2008 Connection OK
1,229 ip dbserver2 sapdp02 Remote Gateway ip dbserver2 ip dbserver2 Wed Jun 25 09:02:12 2008 Connection OK
1,292 QAS sapdp01 Remote Gateway QAS ip qas Wed Jun 25 08:38:04 2008 Connection OK
1,319 DBSERVER jlaunch External Client DBSERVER ip dbserver1 Wed Jun 25 09:02:12 2008 Connection OK
1,377 DBSERVER1 IGS.PRD Registered Server DBSERVER1 ip dbserver1 Wed Jun 25 09:02:38 2008 Connection OK
RFC Trace file
============
Sun Jun 22 15:01:03 2008
***LOG Q14=> GwIConnectHandle, max gateways (100) [gwxxrd.c 8504]
*****************************************************************************
*
LOCATION SAP-Gateway on host DBSERVER1 / sapgw02
ERROR max no of gateways exceeded (100)
*
TIME Sun Jun 22 15:01:03 2008
RELEASE 700
COMPONENT SAP-Gateway
VERSION 2
RC 631
MODULE gwxxrd.c
LINE 8505
COUNTER 112523
*
*****************************************************************************
I am unable to verify the RFC and unable to transport from QAS to PRD
Regards
User | Count |
---|---|