i am new to SAP SRM can one help in business process for plan driven procurement, Self Service procurement-direct and indirect, service procurement with example

thanks

urs friend

krishna

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

hi,

These are Plan Driven Procurement - Prerequisites

SRM system settings

-


-> perform all steps for direct material

-> set up entry channel for external requirements

-> assing an RFC user for this entry channel

-> assign your local purchasing group as responsible for this channel

-> set up sourcing configuration

R/3 Backend settings

-


-> maintain tables V_T160EX and V_T160PR

-> make sure to have a RFC connection to the EBP system, with the same RFC user as in the entry channel (with SAP_ALL and SAP_NEW Profiles)

-> schedule report BBP_EXTREQ_TRANSFER to transfer the requisitions to EBP

After customizing the direct material, there are additional steps necessary:

-> Using an entry channel, the requisitions are transferred into EBP. This channel must have at least one

entry user.

-> Corresponding to this entry user, you have to set up a RFC connection from back end to EBP by using

this special RFC user.

-> To get the requisitions in the work list for purchase orders, or in sourcing, there is a local purchasing

group required with the responsibility for the entry channel and the product category of the back-end

requisitions.

-> Customizing of sourcing or a BADI decides if the sourcing transaction or the work list for purchase

orders will be used

-> View V_T160EX in the R/3 back end determines which material groups and purchasing groups are

grouped into a profile. View V_T160PR determines which profile targets to which RFC connection.

-> The transfer itself is carried out by the report BBP_EXTREQ_TRANSFER. These can be scheduled (for example, once a day.)

See these related threads/notes:

Note 656597 - External requirements not transferred to SRM

PS: Do award points if helps.

Former Member
0 Kudos

hi,

For Plan Driven Procurement, on ECC, you need to maintain table entries V_T160EX and V_T160PR and schedule report BBP_EXTREQ_TRANSFER on ECC. V_T160EX determines which material groups are grouped into profile and V_T160PR determines which profiles target which RFC.

Check this too