Dear All,according to the standard application and SAP help,when we create a project,we can make an option on the control tap with three choices,non-stock,non-valuated stock and valuated stock.But after we save the project,we can never make any changes among these three(turn gray).
What configuration should I make if I wanna make the non-valuated stock option hidden and the other two can be selected after saving(just like the fields).
Hi,
After saving the project u can't change ur selection by any means of configuration.
Thanks
Kishore
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kishore,
Concerning the issue on the statment that you made on configuration of the stock option whereby you have mentioned that after a project with profile of non-value stock option had been created, there is no turning back on choosing the another stock option. May I know what is the reason behind? i.e why the system does not allow a change?
Thank you very much.
Patrick