Hey! how come the consumption of PIR does not work in APO? My material in R/3 has 40 as planning strategy. When i created a PIR and SO, in MD04 PIR was reduced by the quantity in SO. however, in APO PIR was increased by the quantity in SO. I cant figure out why this is happening. hope you can help me
the strategy in APO is 20
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Is the strategy of the material is 10 in APO..