Budget Report Error

Former Member
0 Kudos

In Budget Report S_ALR_87013558 , i'm getting wrong sum in Actual Column at WBS level. Sum of actual cost of network below that WBS is not matching with the WBS actual cost.

In fact WBS actual cost is getting doubled.

What can be the reason ? Its little urgent.

Regards,

Ashish

Accepted Solutions (0)

Answers (2)

Answers (2)

varshal_kachole3
Active Contributor
0 Kudos

Hi,

check whether any overheads are being calculated via costing sheet.

Hope its useful.

Thanks..

Former Member
0 Kudos

Hi,

Please check & analyse the controlling document for the particular actual posting.

If the actual cost is updated against network as well as WBS(duplication)... account assignment settings have to be modified.

Thanks

Kishore