Inspection Plan for all plants

Former Member
0 Kudos

Hi,

How can I create inspection plan using QP01 for a material that will extend throughout all the plants, instead of creating one plant by another.

Please help, Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Hui Leng Yeoh...,

Yes you can do it in QP02.

go to header Details screen. click Mat.Assign tab

and give the material number and plant.

i hope this is sloved. if not comeback.

regards.

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Task list is nothing but an inspection plan and under inspection plan you create operation.You use operations to describe individual inspection steps in an inspection plan. You define the work center, at which the inspection takes place and the default values for the inspection. You can describe how the inspection is to take place in the text for the inspection operation.

Please refer the blow link[http://help.sap.com/saphelp_47x200/helpdata/en/70/2db434d6e3681ae10000009b38f83b/frameset.htm] to clarify -

Sanjay

Former Member
0 Kudos

May I know what is the different between task list and operation tab in Inspection plan creation? what are their function?

Former Member
0 Kudos

it doesnt work...

Former Member
0 Kudos

Hi Hui Leng Yeoh ...,

Please try it will work. for a given Gr.Counter.

regards.

Former Member
0 Kudos

sorry, my fault. It works. thanks.I will asign points, Thanks

Do we have to do this for all materials? What are the normal practise that industry works?

Is there any mass inspection plan creation in sap?

Former Member
0 Kudos

Hi Hui Leng Yeoh ..,

Create a plan and assign it to any number of materials. this plan will works as like creation of individual plan for each material.

Sorry there is no mass programme to do it.

manually in excel sheet copy the material number and plan then copy it in plan.

regards.