Hi All,
We have a requirement of creating a two costed preliminary legs , a main (Not costed)and a subsequent leg(costed).
Or
A way of creating a preliminary(costed), a main(NC) and two subsequent leg (costed)
Guys any idea would be helpful.
Thanks
Sudhakar
Hi sudhakar,
U can create n number of preliminary and Subsequent legs.
For this Goto IMG- Logistics execution-Transportation-Basic Transportation function-Define Shipping Types.
In Detail Screen Of ur Shipping Type.Select Determin Leg.In this selectStage-3"Preliminary legs as per Loading Point and subsequent legs as per ship to party.
pls note u can do this only if u have different shipping points as well diff ship to parties and Same ROUTE.
Pls revert in case of any clarification.
Amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sudhakar,
I am looking for a solution for the same type;
have u solved it.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
U can create n number of preliminary and Subsequent legs.
For this Goto IMG- Logistics execution-Transportation-Basic Transportation function-Define Shipping Types.
In Detail Screen Of ur Shipping Type.Select Determin Leg.In this selectStage-3"Preliminary legs as per Loading Point and subsequent legs as per ship to party.
pls note u can do this only if u have different shipping points as well diff ship to parties and Same ROUTE.
Pls revert in case of any clarification.
Amit
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.