on 06-11-2008 4:03 PM
Hi,
I have two DP PPMs for same output product P1 but for two different locations L1 and L2
Suppose the PPM names are: DP_P1_L1 and DP_P1_L2
I have two combinations in my MPOS
P1 - L1
P1 - L2
When I add BOM information for the respective planning object structure, I want the PPM to be associated to the combinations based on locations. But the system is generating 4 new combinations after deleting these two old ones. The new CVCs are:
P1 - L1 - DP_P1_L1
P1 - L2 - DP_P1_L1
P1 - L1 - DP_P1_L2
P1 - L2 - DP_P1_L2
As you can see that second and third combinations are totally wrong.
What can I do to associate the right PPM to right location specifc combinations.
Please note that I am already putting the required Planning and Production location in both PPMs (L1 for DP_P1_L1 and L2 for DP_P1_L2)
Expecting some quick and helpful replies on this issue.
Cheers!
Rimjhim Jain
You might need to explore the BADI /SAPAPO/SDP_MASTER to make sure right combinations are getting created. This BADI will make sure additional checks are done at CVC creation.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Srinivas for your reply, I checked the BADI and maybe a workaround is possible by putting additional checks through this BADI. But I am still not convinced that this will be the best solution
Is this a normal system behavior - to assign the PPMs irrespective of location?
It looks logically incorrect. If there is a Note anyone is aware of, I'll be grateful if you could pass my more information on it.
Regards,
Rimjhim
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.