I am doing IDoc scenario and it is working fine.

When i transport this scenario from Quality server to PI Production it is showing wrong BS name in scenario.

Following are the settings available in my SLD.

There are 3 BS for PI servers: PID , PIQ , PIP

and 3 BS for SAP servers: SAPD , SAPQ , SAPP.

I have created 2 groups DEV and PRD and following BS are assigned to it.

DEV group: PID , PIQ , SAPD , SAPQ

PRD group: PIP, SAPP

Following are the transport targets maintained:

Source->Target

PID->PIP

PIQ->PIP

SAPD->SAPP

SAPQ->SAPP.

With this settings when i transport my PI scenario from PIQ to PIP then the SAPQ Business System should get changed to SAPP automatically. However unfortunately it is getting changed to PIP.

Can anybody suggest why is it happening? Am i doing something wrong? Where to look for the correct settings?

Thanks,

Atul

Accepted Solutions (1)

Accepted Solutions (1)

nisarkhan_n
Active Contributor
0 Kudos

Are you on single SLD?

when you move your interface from the Q envinorment to P, the SAP system name is getting resolved wrongly.

cross check the following things

1. in the Configuration of the interface in the Q envinorment whats the BS name of the SAP (i hope it is SAPQ)

if it is then come to the group (transport targets) and check is it porperly linked to SAPP..

if this is fine...cross check the names of the systems are properly pointing to the correct system.

i think it might be stuck in either of these places.

just try to recreate the tarnsport targets once more for Q to P for SAP

Former Member
0 Kudos

Hi Nisar ,

thanks for your reply.

Actually we have 2 SLDs. one for DEV and Quality and other for Production.

All these settings i have made in SLD of DEV and Quality.

Is it also necessory it transport these SLD settings to SLD of Production?

I have a confusion here. When we transport objects from PIQ to PIP then it refers to which SLD? SLD of PIQ or SLD of PIP?

Thanks,

Atul

Former Member
0 Kudos

Yes, You have to move all those to Prod from Q system.

Thats what I mentioned in my first reply.

Thanks

Kiran

Former Member
0 Kudos

If you want to refer PIP SLD then you have to manually transport all SWCV, Technical System and Business System from PIQ to PIP server.

Once you have done this then your actual Directory transports works.

Gaurav Jain

Former Member
0 Kudos

Hi All,

Thanks for your replies.

My problem is solved now. There was some inconsistency in both of the SLDs so i was not getting the BS names correct.

Thanks again for ur help.

Regards,

Atul

Answers (1)

Answers (1)

Former Member
0 Kudos

Are your production related business systems and others are transported before you could move your scenarios?

thanks

kiran

Former Member
0 Kudos

Hi Kiran,

Thanks for your reply.

Are you asking me regarding SLD transport?

I am doing these changes in SLD of Quality server and some of these settings are not there in SLD of production. Is it required to transport the SLD with these settings to production?

Thanks,

Atul

Former Member
0 Kudos

are you making changes to ur scenario or sld?

if sld, Just give a try and see if it works out and lemme know.

Thanks

Kiran

Edited by: kiran dasari on Jun 11, 2008 12:22 AM

Former Member
0 Kudos

Hi Kiran,

What changes are you suggesting me to try?

Thanks,

Atul

Former Member
0 Kudos

Atul,

Verify that during Business System creation whatever Group and Related Integration Server define for quality is correct.

In the Transport Tab (in Business System) you have added Target Business System name properly.

Gaurav Jain

Former Member
0 Kudos

Exactly, I had the same in mind as nisar explained.