cancel
Showing results for 
Search instead for 
Did you mean: 

100% Sampling Procedure is not functioning for Prod. Order - Insp.Type:03

Former Member
0 Kudos

Hi Experts,

We have a number of material as SPARE PARTS.

We are creating Production Order for these Spare Parts.

Inspection Type 03 is used for it.

Customization -> Define Default Values for Inspection Type

Sample  100 % Inspection Check Box is activated

Skips Allowed Check Box is activated.

Material Number : 571113211

QM View

Inspection Type 03 is assigned

100 % Inspection Check box is activated (By Customization Setting)

Skips Allowed Check Box is activated (By Customization Setting)

Routing is created for this material .

For the operation 10, Two MIC are assigned.

For Each MIC the 100% SAMPLING PROCEDURE IS ASSIGNED

Production Order is created with Qty. : 80.

System generates the Inspection Lot.

The result recording screen the u201CINSPECT FIELD  SOLLSTPUMF IS 1 ONLY.

It must be 80.

I am able to record only one entry.

As 100 % SAMPLING PROCEDURE IS ASSIGNED TO THE MIC,

THE LOT SIZE OF THE PRODUCTION ORDER MUST BE THE SAME OF SAMPLING SIZE.

For the manual Inspection type, I just assigned the sampling procedure to the MIC in Inspection Plan.

When I created the Inspection lot the Sampling size with Inspection Lot qty of 80,

I am able to enter the result for the specified MIC 80 times.

 It is working fine for manual Insp. Type  89.

With Best Regards,

Raghu Sharma

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Dear All,

The issue is sorted out.

I am closing the issue.

With Best Regards,

Raghu Sharma

Former Member
0 Kudos

Hi Raghu,

I tried the same scenario but I am getting the qty correctly. Have you inserted sampling procedure in QP01 and in Routing ? pl check and come back.

Regards,

Rajaram.K

Former Member
0 Kudos

Hi Rajaram,

Thanks for your prompt reply.

The issue is solved.

This is the requirement of Inprocess Inspection.

I am assigning the MIC in Routing.

Hence I need the Inspection lot as soon as Production Order is released.

In Material Master QM View, Inspection Type 03.

I have deactivated the 100% Inspection Check Box.

The issue is solved.

With Best Regards,

Raghu Sharma

Former Member
0 Kudos

Hi Raghu,

When do you want the QM lot to be generated?

Inspection type 03 is for in process checking.

You need to assign inspection type 04 at the time of Goods Recipt against the Production order.

In material master, in QM view put 04 inspection method.

Try in this way. It will work.

Srini

Former Member
0 Kudos

Hi Sirini,

Thanks for your prompt reply.

I want it as soon as the production order is released.

This is In Process Inspection.

The issue is solved.

In MM for the Inspection Type 03 ,(QM View)

I have deactivated the check box of 100 % Inspection.

I am assigning the MIC in Routing.

Thanks for your prompt reply.

With Best Regards,

Raghu Sharma