on 06-06-2008 11:03 AM
Hi Experts,
We are getting an error when trying to perform MLC in cProjects 4.0.
If turning on automatic MLC, we get the error Internal error: Calling costing leads to exception
If working with manual MLC, in the screen for searching PS projects
1. We don't get any of the search fields
2. We don't find any project in the system
As a test, I can say it is possible to create object links to WBS elements in the Object link tabs correctly.
Any idea on what can be failing here?
Thank you!
Kind regards,
Neil
Edited by: Neil Billqvist on Jun 6, 2008 12:41 PM
Only half of my problem has been solved. Still not finding any project in PS...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Neil,
Internal error: Calling costing leads to exception --> use note 1019075.
-
for mannual please check the settings
-->spro
-->Collrabration project
-->Connection to External system
-->Account integration
-->define object link for account integration
In that page you will find two object type on right side table
one for WBS elemet and another for internal order
select: 0FIN_INT_ERP_PS
Then double click on Name of classes inSAP (letf hand side dialog structure)
then change the proxy class CL_R3_OLR3_PROJECTDEFINATION or CL_DPR_OLR3_WBSELEMENT
Also check project type details wether you have activated Accounting integration scenario if please activte
and please check is any project is created from PS module or not
and Also take help of note 977951
this note support for ECC 6.0 And cproject suit 4.00
thanks
sunil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sunil,
Thanks for your help, but the configuration is already made, and the note you suggest are for internal order scenario while we are working on multilevel controlling.
The proxy class is the right one - CL_DPR_OLR3_WBSELEMENT
(it works for the object link to wbs elements) and projects are created.
Maybe the main clue is that the search field do not work either in the accounting tab. They do on the object links and the same searchfields are customized for both links.
Any idea?
Neil
Hi Neil ,
Check this input also
1) In account integration --> make genaral seetings
Project type and object type assingment
For MLC project use 0FIN_INT_ERP_PS .And no cost indicator .
2) when you make setting in ERP In Controlling define controlling Scenario your project type have correct Controlling method.and CO senario.
thanks
sunil