on 06-05-2008 9:52 AM
Hi all ,
I have scheduled Back Ground Job in Production System at morning 11am, now the job is in running status,but i wonder that before the status come to completed the
LAST RUN Column is filled with Date and time same at 11:am.
Please find the below job log details i am pasting last few lines of job log
Jun 5, 2008 2:15:22 PM com.virsa.cc.xsys.riskanalysis.AnalysisEngine performActPermAnalysis
INFO: Job ID:6 : Before GC => memory usage: free=481M, total=1009M
Jun 5, 2008 2:15:22 PM com.virsa.cc.xsys.riskanalysis.AnalysisEngine performActPermAnalysis
INFO: Job ID:6 : Analysis starts: HTREMGMT2
I would like to know wheather job is running or terminated.
Wat is the sequence of JOB status in CC5.2.
Kindly do the needfull.
It is worth noting in AC 5.2 that the % indicated is only relevant for that current "pass", a risk analysis batch job may have several "passes", and it does not indicate in the logs which pass it is perfroming and how many are left eg: no 1 of 3 indicator.
AC 5.3 is better for giving the users this information but is still far from perfect.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Amol,
Thank You very much for ur quick reponse,
please find the view job log details
(last few lines)
Jun 5, 2008 3:07:12 PM com.virsa.cc.xsys.riskanalysis.AnalysisEngine performActPermAnalysis
INFO: Job ID:6 : 464 out of 818 (56%) done
Jun 5, 2008 3:07:12 PM com.virsa.cc.xsys.bg.BgJob setStatus
INFO: Job ID: 6 Status: Running
Jun 5, 2008 3:07:12 PM com.virsa.cc.xsys.riskanalysis.AnalysisEngine performActPermAnalysis
INFO: Job ID:6 : Before GC => memory usage: free=347M, total=1009M
Jun 5, 2008 3:07:12 PM com.virsa.cc.xsys.riskanalysis.AnalysisEngine performActPermAnalysis
INFO: Job ID:6 : Analysis starts: MACTUSER17
Jun 5, 2008 3:07:21 PM com.virsa.cc.xsys.meng.ObjAuthMatcher <init>
FINEST: ObjAuthMatcher constructed: 0ms, #singles=970, #ranges=0, #super=0
Jun 5, 2008 3:07:22 PM com.virsa.cc.dataextractor.bo.DataExtractorSAP getObjPermissions
FINEST: getObjPermissions: elapsed time=891ms
can u tell me the job status sequence
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Karuna,
You scheduled background job at 11 am, that means the background job was last executed at 11 am only.
There is no link between the state and last run column. The last run column shows when did you last performed this activity. it doesn't matter whatever state of your background job is, it will still show value in last run column even if the state turns out to be an error, running or complete.
According to the given log, your job is in running state. Can you again check the log and post the latest log details if the state is not yet complete.
Best Regards,
Amol Bharti