Hi,
May I know that what is the purpose of setting up the inspection setup when creating a new material?
Other than setup the inspection in MM01, do I still need to setup inspection plan?
currently, the material failed to create in inspection lot, QE01, the message i get is CRTD CHCR SPRQ.
does anyone know any of this? Thanks
The purpose of activating the inspection setup in material master is to create the inspection lot. Yes you need to create an inspection plan for a particular material if you want to create inspection lot.
The status which you got in the inspection lot, CRTD CHCR SPRQ. is due to non availability of inspection plan.
Solution is to create an inspection plan in QP01 and assign it manually through QA02.
If you assign the inspection plan in QA02, the status will be changed to REL SPRQ which means you can process the inspection lot.
thanks
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
No you need not do this everytime.
The earlier suggestion was given bcoz you have already created the inspection lot without inspection plan. Once the inspection plan is created in QP01, it will be updated and inspection lot is created automatically.from the date of creation.
thanks
G. Lakshmipathi
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.