Hi,
We have a requirement where a job should be executed in 1 system, only if another job succeeds in another system.
Both the systems are connected to each other.
Can this be done by triggering events..using BP_EVENT_RAISE??
Or if there is some other way, please let me know.
Thanks,
Saba.
Those dependencies can be much easier solved using Redwood Cronacle which comes "for free" with a Netweaver License.
You can either use the "standalone" version which requires an Oracle database, see
Note 1134748 - SAP Central Process Scheduling by Redwood V7.0.3
or use the "integrated" one which will be installed on a Netweaver AS Java:
1054005 - FAQ: Job Scheduling Management with SAP Solution Manager
Markus
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.