Hello,

I would like to know under what circumstances, which Strategy groups are used in MRP2 screen of Material Master. We use Strategy group # 85 to trigger creation of Operative Network and Project when Sales order is created in system for Assembly processing. We are in roofing industry for every roof installation, we create sales order. We don't use Networks but use Projects W(with 2 wbs elements) to capture Planned and Actual Revernue and Costs. If possible, I would like to know with real world scenarios for various Strategy groups used.

Following are the various Strategy groups available in system.

00 No planning / no requirements transfer

10 Make-to-stock production

11 Make-to-stock prod./gross reqmts plnning

20 Make-to-order production

21 Make-to-order prod./ project settlement

25 Make-to-order for configurable material

26 Make-to-order for material variant

30 Production by lot size

31 Prod. by lot, with make-to-order prod.

32 Make-to-order prod. with prod. by lot

33 Prod.by lot, with plng with final assem.

40 Planning with final assembly

41 Plng with final assem, with make-to-ord.

50 Planning without final assembly

51 Plng w/o final assembly / project settl.

52 Plnng w/o final assem. w/o make-to.stock

54 Planning variants

55 Planning variants w/o final assembly

56 Characteristics planning

59 Planning at phantom assembly level

60 Planning with planning material

61 Plng with plng material / project settl.

63 Planning w.plng material w/o mke-to-ord.

65 Planning variants with planning material

70 Planning at assembly level

74 Plng at assembly lvl w/o final assembly

80 Project settlement for non-stock items

81 Assembly processing with planned orders

82 Assembly processing w. production orders

83 Assembly processing with networks

84 Service orders

85 Assembly processing with network/project

86 Assembly processing with process orders

89 Assembly proc. w. characteristics plng

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

For project type of business ie Engineered to Order scenario wherein material is produced as per the Order and may vary from oorder to oredr- In this case strategy group 21 is used for Finished product(FERT).

In the above scenario requirements are generated using project MRP.

For make to order scenario where PS is not used and material is made using Production planning(prod order)-in this case strategy group 20 is is used for Finished product(FERT).