on 05-27-2008 7:19 AM
Hi all,
I've got a simple question, which hopefully has a simple answer
Is it possible in the task list (trx SCMA) to schedule imports for all attached logical systems to that maintenance cycle in 1 time, in stead of scheduling imports for each logical system separately?
We've got 10 logical systems in 1 maintenance cycle. And the imports have to be scheduled on the same timings for all of these systems, so eg. from today untill the 14th of June we want a daily import in all attached logical systems of that maintenance cycle.
Is this possible to do this in 1 action?
kind regards,
David
David,
What do you mean with 10 logical systems? Do you have 8 test/qa systems between your DEV and PRD box?
If all systems are part of one maintenance project/cycle and you execute the action to release or import TRs, it will be triggered for all systems defined in the cycle.
Roel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
No Roel,
I think I took the wrong term. We have several logical system landscapes in 1 maintenance cycle.
For instance:
Maintenance cycle 1 contains:
landscape R3
DEV
QAS
PRD
landscpae BW
BD0
BA0
BP0
landscape SRM
ED0
EA0
EP0
If I want to schedule an import job to import all transports of maintenance cycle 1 in all systems, I have in the above example to schedule 3 jobs. (1 in PRD, 1 in BP0 and 1 in EP0)
The question is whether I can do this by 1 action. Schedule the import of all PRD systems on the maintenance level in stead of the landscape levels separately.
kind regards,
David